Building plan approval cost is not one fee but a bundle of charges: a scrutiny or processing fee to examine your drawings, a sanction or permit fee usually linked to covered area, and, depending on the authority, a construction workers' welfare cess, development or infrastructure charges, and extra charges for things like additional FAR, basements or stilts. For a typical residential plot in Delhi NCR, the government fee component is usually a modest share of the total project budget, but the add-on heads can push it much higher, so you should always ask your architect for a head-by-head estimate from the authority's current schedule. This guide explains each fee head, how it is usually calculated, and which costs owners forget to budget for.

Why There Is No Single "Approval Fee"

Every authority in NCR, whether a municipal corporation, a development authority such as HSVP, Noida or GDA, or a department such as DTCP, publishes its own schedule of charges. These schedules are revised from time to time and differ in three main ways:

  • The basis of calculation: some heads are a flat amount per application, some are per square metre of plot area, and some are per square metre of covered area on each floor.
  • The type of building: residential, commercial, industrial and institutional buildings usually attract different rates, with commercial uses typically the highest.
  • The location: the same authority may charge differently for developed sectors, licensed colonies, villages or areas with special policies.

That is why a figure quoted by a neighbour two years ago is rarely a reliable guide to what your plan will cost today. The honest answer to "what are the fees for building plan approval" is a calculation, not a number.

Free · No sign-upTry it in 3D3D Floor Plan BuilderLay out bedrooms, kitchen, toilets and stairs on your plot and see the plan in 3D, with areas and coverage.Open tool

The Main Fee Heads, One by One

The table below lists the charges you are most likely to see on a demand note. Not every authority levies every head, and names vary.

Fee headWhat it pays forUsual basisApplies to
Scrutiny / processing feeExamination of drawings and documentsPer sq m of plot or covered area, sometimes a flat amountAlmost every application
Sanction / building permit feeGrant of permission to buildPer sq m of covered area, floor by floorMost authorities
Construction workers' welfare cessWelfare fund for building workers under central welfare-cess lawA percentage of estimated construction cost, commonly around 1%Most building projects above the exemption threshold
Development / infrastructure chargesRoads, water, sewer and civic infrastructurePer sq m of plot or built-up areaSome authorities and areas, especially where not paid at allotment
Additional or purchasable FAR chargesBuilding beyond base FAR where policy allowsPer sq m of extra floor area, often linked to land ratesOnly if you opt for extra FAR
Basement / stilt / mezzanine chargesAdditional permitted componentsPer sq m of that componentSome authorities
Rainwater harvesting or other security depositsEnsuring the system is builtRefundable deposit, often linked to plot sizeSome authorities
Malba / debris and road-cut chargesRemoval of construction waste, road restorationFlat or area-basedSome municipal bodies

If your demand note shows a head that is not in this list, ask your architect what regulation it comes from before paying. Most are legitimate, but you should understand each one.

Free toolFAR / FSI & Setback CalculatorHow much can you legally build on your plot — FAR, ground coverage, floors.Try it free

How a Fee Estimate Is Built Up

Your architect calculates the fee from the proposed drawings, so the numbers depend on decisions you make at design stage. A typical worksheet follows this order:

  1. Measure the plot area from the ownership or allotment document and the site survey.
  2. Measure covered area floor by floor, including stilt, basement, mezzanine and mumty, because rates can differ for each.
  3. Apply the authority's rate for each head from its current schedule, by building use.
  4. Estimate construction cost on the basis the authority uses for the labour cess, which may be a notified rate per sq m rather than your actual budget.
  5. Add optional heads such as purchasable FAR, only if you are using them.
  6. Check for exemptions or rebates, for example for small plots, green features or specific policies, where they exist.

Because the fee depends on area, the FAR and FSI calculator is a useful first step: it shows how much floor area your plot may carry before you commit to a design that triggers extra charges.

Worked Example (Illustrative Only)

To show how the heads stack up, here is a structure for a hypothetical G+2 house on a 200 sq m residential plot. We have deliberately left the rates blank because they differ by authority and change over time.

Line itemQuantityRateNotes
Scrutiny fee200 sq m plotAs per scheduleUsually payable on submission, often non-refundable
Sanction fee, stiltStilt areaAs per scheduleSome authorities exempt stilt parking from FAR but still charge
Sanction fee, floors 1–3Covered area of each floorAs per scheduleLargest variable head on most homes
Labour welfare cessEstimated construction costPercentage as notifiedCalculated on authority's cost basis
Purchasable FAR (if opted)Extra floor areaAs per policyCan exceed all other heads combined
DepositsAs applicableAs per scheduleTrack refund conditions

In practice, the cess and any purchasable FAR are the two heads that most often surprise owners, because both scale with the size of the building rather than the plot.

Haryana, Delhi and UP: What Differs

Owners searching for building plan approval fees in Haryana often find several schedules because different bodies control different land. In broad terms:

  • Haryana: DTCP, HSVP, HSIIDC and the municipal corporations each apply the Haryana Building Code with their own charge schedules. Licensed-colony plots may carry charges tied to the colony licence, while purchasable FAR and some policy-based heads apply only where notified.
  • Delhi: MCD, NDMC and DDA areas have separate processes. Small residential plots may come under simplified or self-certification routes, and charges can differ between them.
  • Noida, Greater Noida and Ghaziabad: the development authorities (Noida, GNIDA, GDA, YEIDA) apply UP regulations and their own schedules, often with time-linked conditions from the allotment.

Our guides to building approvals in Delhi and FAR and building bye-laws in Delhi NCR explain the process side; this article focuses only on the money.

Costs Owners Forget to Budget For

The government demand note is only part of the real building plan approval cost. A complete approval budget usually also includes:

  • Architect's drawing and submission fees, which cover the sanction drawing set, online filing and replies to objections. See our guide to architect fees in India.
  • Structural design and stability certificate from a qualified structural engineer.
  • Survey and soil test, often needed before drawings can be finalised.
  • Third-party NOCs such as fire, airport height clearance or tree cutting, each with its own fee where applicable.
  • Revision charges if the plan is changed after sanction.
  • Completion or occupancy stage charges later in the project, plus any compounding fee for deviations.
  • Utility connection charges for water, sewer and electricity, which are separate from the plan fee.

How to Keep Approval Fees Under Control

  1. Get the area right first. Every extra square metre of covered area costs fees, construction and tax. Trim circulation and dead space at design stage.
  2. Decide on purchasable FAR early. Opting in later can mean a revised plan and a second round of fees.
  3. Submit a complete file. Objections delay sanction and, with some authorities, a fresh scrutiny fee applies on resubmission.
  4. Build to the sanctioned plan. Compounding fees for deviations at completion stage can exceed the original sanction fee.
  5. Keep every receipt. Banks, buyers and the completion stage will ask for proof that all charges were paid.

Disclaimer: fee heads, rates and exemptions vary by authority and are revised periodically. This is general guidance; confirm current charges on the concerned authority's official portal before applying.

Get an Accurate Approval Fee Estimate

Panache Architect prepares sanction drawings and handles building plan approvals across Delhi, Gurugram, Faridabad, Noida, Greater Noida and Ghaziabad. We work out a head-by-head fee estimate from the authority's current schedule before you commit to a design, so there are no surprises on the demand note. Book a free consultation to get an approval budget for your plot.