How the building sits on the land, from orientation, entry and parking to levels, drainage and utilities, planned before the building position is fixed.

  • Orientation, sun path and wind
  • Entry, driveway and parking layout
  • Open areas, landscape and levels / drainage
  • Water tanks, septic / STP, meters and utilities
Site Planning
Registered ArchitectsCOA-registered practice
One Coordinated TeamDesign, approvals & engineering
Engineering In-HouseStructure, electrical & plumbing
10+ Years3,500+ projects delivered
Quick answer

How the building sits on the land, from orientation, entry and parking to levels, drainage and utilities, planned before the building position is fixed. Budget roughly ₹1,650–4,200 per sq ft of built-up area in Delhi NCR, depending on finish level.

  • 6 deliverables handed over
  • 6 areas of scope covered
  • Serving 112 cities across Delhi NCR & nearby
  • Free initial estimate & scope call
Indicative cost

What site planning typically costs in Delhi NCR

Construction cost per sq ft of built-up area
Finish level₹ / sq ftWhat it covers
Basic ₹1,650 – ₹2,050 Standard fittings, basic tiles, putty & paint
Standard ₹2,050 – ₹2,850 Branded fittings, better flooring, some joinery
Premium ₹2,850 – ₹4,200 Premium finishes, extensive joinery & false ceiling
City adjustment applied to the rates above
CityFactor
Delhi1.05×
Gurugram1.08×
Noida1.00×
Greater Noida0.97×
Ghaziabad0.97×
Faridabad0.97×
Meerut0.92×
Mathura0.90×
Palwal0.90×
Jewar0.92×

Indicative ranges only — excluding land, approval fees and GST. They exclude design fees, which are quoted per project. Run your own numbers with the construction cost calculator, or .

Overview

Planning the whole plot, not just the building

On a small urban plot, setbacks largely decide where the building goes. On a farm house in Chhatarpur or Sohna, a school campus in Greater Noida or an institutional site on the edge of Faridabad, there are real choices to make, and they shape how the property works for decades. Site planning is the stage where those choices are made with care.

We begin with the land itself: its boundaries, levels, existing trees, approach roads and surroundings. We study the sun path and prevailing winds to decide which way the main building should face, where shade is needed and which areas will be pleasant to use through a Delhi NCR summer and winter.

Next comes movement. The main entrance, driveway, visitor and staff parking, service access and pedestrian paths are laid out so they do not conflict with each other. Open areas such as lawns, courts, play areas and gardens are placed where they are most usable, and the site is graded so rainwater drains away from buildings rather than collecting against them.

Finally, we plan the practical infrastructure that is often decided too late: underground and overhead water tanks, septic tank or STP location, electricity meters and transformer space, borewell and service trenches. With these fixed early, the building, landscape and engineering can all proceed without costly relocation later.

Who this is for
  • Farm house owners
  • Schools and college campuses
  • Institutional and government sites
  • Hotels and resorts
  • Owners of large plots
  • Developers planning multiple blocks
Scope of Work

What site planning covers

01

Orientation and climate

Building position set using sun path and wind direction for comfort and shade.

02

Access and driveways

Main entry, service entry and internal roads planned without conflict.

03

Parking layout

Visitor, staff and resident parking sized and placed for easy movement.

04

Open areas

Lawns, courts, play areas and gardens placed where they will be used most.

05

Levels and drainage

Site grading and stormwater paths planned to keep water away from buildings.

06

Utilities placement

Water tanks, septic tank or STP, meters and service routes fixed early.

What You Get

Deliverables & documentation

Clear, professional outputs at every stage — nothing left ambiguous.

  • Site analysis drawing with sun, wind and surroundings
  • Site plan showing building footprint and setbacks
  • Access, driveway and parking layout
  • Open area and landscape zoning plan
  • Site levels and drainage plan
  • Utilities and services location plan

Get a Detailed Proposal

Site Planning · Reply within 24 hours

Your details stay private. No spam.

How It Works

Your project in 4 clear steps

  1. 01 Survey and site visit

    We walk the site and use a survey to record levels, trees and boundaries.

  2. 02 Site analysis

    We map sun, wind, views, access roads and surroundings to identify constraints.

  3. 03 Site layout options

    We test building positions, access and open areas in alternative layouts.

  4. 04 Final site plan

    The agreed site plan with levels and utilities guides building and landscape design.

Why Panache

Reasons clients choose us

  • Architecture, interiors, engineering & approvals in one team
  • Written scope and fees before work starts
  • Coordinated, construction-ready drawings
  • One point of contact throughout
  • Local knowledge across Delhi NCR
  • 10+ years, 3,500+ projects
How fees work

Architectural fees are quoted either as a fixed lump sum or per square foot of built-up area, depending on the project type and the stages you appoint us for. You receive a written proposal listing every drawing, the number of site visits and the payment stages before work begins.

Client Voices

What our clients say

"We handed over an empty 3BHK and got back a home that finally feels like us. The team listened to how we actually live — not how a catalogue thinks we should — and it shows in every corner."

R Rohit & Meera KhannaHomeowners, DLF Phase 4, Gurgaon

"The modular kitchen is the star of my house now. Soft-close everything, a pull-out for my masala dabbas, and not a single wasted inch. My mother-in-law approves, which is the real 5 stars."

S Sana QureshiHomeowner, Sector 78, Noida

"What sold me was the 3D walkthrough — what I saw on screen is exactly what got built. No surprises, no 'arre sir yeh possible nahi hai' after booking."

A Arvind MenonHomeowner, Indirapuram, Ghaziabad
FAQs

Questions about site planning

Can’t find your answer? Call or WhatsApp us — we reply quickly.

For larger plots, farm houses and campuses, a proper survey showing boundaries, levels and existing features is strongly recommended. Site planning based on assumptions can lead to drainage problems or buildings placed in the wrong spot. If you do not have a survey, we can arrange one as part of the appointment.
On a typical urban plot, setbacks and road access decide most of the site layout, so site planning is usually handled within concept and layout planning. A dedicated site planning stage is most valuable on larger plots, farm houses, institutions and campuses, where the building position involves real choices.
Site planning fixes the zones for lawns, gardens and open areas along with levels and drainage. Detailed landscape design, including planting, hardscape and irrigation, can follow as a separate stage handled by our landscape team, so the building and outdoor spaces are planned together.
We consider distance from the building and water sources, access for cleaning vehicles, ground levels for drainage and any requirements of the applicable authority. Fixing its position early avoids placing it under a future lawn or driveway, or too close to a borewell or water tank.